The project is located along MASOWE I A road to Likotsi, on the right, opposite MASOWE IV. It was developed in 2003.It offers a mixture of middle- and high-income sites averaging 400 sqm and 600 sqm. The project comprises of 791 sites. The sites are surveyed and serviced with partial gravel roads and water reticulation.